The Church of the Holy Spirit
began in 1980, constructing their original building in
1982. It consisted of a sanctuary, a small parish hall,
a small nursery area, and a small office area. As the
congregation began to grow, the need for classrooms for
adults and children grew as well, so a mobile classroom
was brought to the site. However, in the mid-90's, the
congregation began to grow so rapidly that this was no
longer sufficient to meet their needs or to sustain growth.
In 1997, they decided that additional classrooms and fellowship
would have to be added as soon as possible.
The goal of the Church was
to grow to at least 800. It was uncertain whether or not
the relatively small site (4.57 acres) could support a
congregation of that size. If so, their wish was to stay
at their present location, but they were not opposed to
moving to another site if that is what was required to
achieve their goal.
A Master Plan for 800 was developed
by designing a 2-story addition to the original building.
This allowed all building construction to be concentrated
in the center, and maximized the parking by placing it
around the circumference of the site.
Due to budget constraints,
the first phase of construction included only the large
Multi-Purpose Room, and part of the first story that surrounded
it. It was designed and constructed to allow the addition
of the rest of the building as easily as possible. For
example, the roof structure was actually constructed as
a floor structure for the second floor, and all utility
service lines (electrical, water, gas, sewer) were sized
to service all future construction included in the Master
Plan.
Project Data:
9,000 sf
Original building area.
56,000 sf Total
Master Plan area, including the original building.
18,000 sf First
Phase Addition, completed August 1999
Builder - Vista Construction,
Sapulpa, OK 918-227-1800