|
Haikey Park Baptist Church
Broken Arrow, Oklahoma
Project Description:
Haikey Park Baptist Church currently resides in a facility of
about 9,500 square feet, which includes a sanctuary that seats
about 150 and an educational wing. They have a very small fellowship
area that can seat approximately 75 people. Their most immediate
need are for more parking, more fellowship space and more restroom
facilities. Their project is designed to be phased, meeting the
most immediate needs first, then additional needs for more parking
and educational space.
Their site presented several challenges. First, the southernmost
portion of the site is inflood plain, reducing their useful acreage
from 5 acres to about 3.4 acres. Second, topography is severe,
requiring significant cut and fill for any addition. Third, the
existing sanctuary was not designed for expansion, requiring a
major renovation to add worship seating. Their existing maximum
capacity is about 150.
Phase 1 This phase will include the addition of a Fellowship
Room that will seat about 300 at round tables and about 500 at
rectangular tables. The addition will also include large restrooms
a large vestibule and hallway, and a commercial kitchen. The existing
educational wing will be remodeled to create a secured area for
young children, and the existing fellowship area will be converted
to adult classrooms. A parking addition will increase their parking
spaces from 66 to 127. Phase 1 will increase the church capacity
to about 245.
Phase 2 This phase will increase sanctuary seating from the existing
150 to 328, and will add educational space that will increase
Sunday School capacity to 209 (not including use of the fellowship
room as a classroom). Parking capacity will be increased to a
total of 205, effectively increasing the church capacity to about
410.
Project Data:
14,658 sf Phase 1 – Fellowship Building Addition
10,223 sf Phase 2 – Office Remodeling
View
Floorplans
|